Ice778: Nebulized f.g ice; with hydrostatic chamber

T= 200 K, 100 MPa, 3.3 hrs step (0) hydrostatic compaction
T = 220 K, P = 50 MPa, s = 2->2.4 MPa step (1)
T = 220 K, P = 50 MPa, s = 2.4 MPa step (2)
T = 220 K, P = 50 MPa, s = 3.4 MPa step (3)
   

Legend: Upper graph of each pair is motor speed V (proportional to edot); lower graph is load (in volts). Translate motor V to edot thus: V1.00 ≈ 6e-6/s ≈ 2%/hr. Load to stress translation for ice ___is roughly ___ MPa/mV, with a __mV zero offset. Horizontal scale is time. 5000 ≈ 14 hrs.

     
e = 0.173

 

 

Step (2)->step (3)

 

8/11/14 1335 hrs

e = 0.161

 

 

Still step (2)

 

8/11/14 0913 hrs

e = 0.146

 

 

Step (2)

 

8/10/14 2244 hrs

e = 0.127

 

 

Start of step (2)

 

8/10/14 0907 hrs

e = 0.106

 

 

End step (1)

 

8/10/14 2110 hrs

e = 0.071

 

 

Still step (1). Hit V limit for a while there during a slight overwarming incident.

 

8/9/14 0120 hrs

e = 0.053  
e = 0.025

 

 

Start of step (1)

 

8/8/14 0042 hrs